Blacktop paving: August 13 & 14

Access to our driveway will be limited by the blacktop repair that is scheduled for August 13 and 14th.  The dates may change if there is a lot of rain in early August.

During the week, if you find the driveway blocked, you can park on Cannon Drive or at the High School and walk into the building.